Deer Valley Water Treatment Plant - Phoenix, Ariz
The scope of work included demolition of the existing hopper bottom, metal roofed reservoir, the construction of a new 20 MG cast-in-place reservoir, installation of chemical feed piping, level sensors, transmitters and associated conduits and control wiring.
Project construction occurred during active plant operations with some activities needing close coordination with both security personnel and plant operations staff. Kiewit provided the City and the Engineer full preconstruction services including cost models, constructability reviews and scheduling analysis throughout the design. The project included: