Rueter-Hess WTP is a new facility being developed by the City of Parker, Colorado Water and Sanitation District. Kiewit subsidiary, Wester Summit, completed Bid Package #5 – Site Pipe, and Bid Package; #8 – Concrete and General Trades.
Bid Package #5 consists of 30 different piping systems ranging from 48-inch steel piping to 4-inch gas piping. Each conveyance system being installed will be coordinated in conjunction with Bid Package #3 – Earthwork.
Bid Package #8 includes all concrete work, mechanical process piping and valves, plumbing enclosures, the setting of owner furnished equipment, masonry, thermal protection, miscellaneous metals, and openings. WSCI functional startup and testing of equipment.