Waltham High School Roof-Mounted PV System
Mass. Electric Construction Co (MEC) installed an 880 KW roof mounted PV system on the Waltham High School in Massachusetts. The scope of work included PV modules- 3080 each LG250 mods; inverters 2 each- Solaron 333kW; an Hb Solar Mounting System (100% ballasted) including ballast; Solar BOS fused Combiner Boxes; Data Acquisition System (DAS); and (8) 200A rated Fusible DC Disconnect.