Lost Cabin Gas Plant - Lost Cabin, Wyo.
TIC, a subsidiary of Kiewit, constructed both expansions for the addition of train 2 and train 3, to add needed capacity.
The second train is a 62 million standard cubic feet per day (MMscfd) facility. Train 3 is the largest of the three trains at 180MMscfd, and when combined with Trains 1 and 2, brings the total plant capacity to 313MMscfd.
Location: Lost Cabin, Wyo.
Completion: September 2002
Manhours: 1.5 million+