Oil, Gas & Chemical
Kiewit Energy Canada fabricated and set 43 modules, built the central processing facility, constructed well pads, and laid pipelines for Phase 1 this 3,000 bpd facility. Phase 2 was a Kiewit-led EPC project, included adding 22,000 barrel-per-day capacity to Phase 1. By self-performing critical path elements, including the fabrication and setting of 118 modules, Kiewit was able to keep the project on time and on budget.
Kiewit Energy Canada provided FEED services including constructability reviews and the development of project execution plans the 120,000 bpd SAGD plant. Kiewit co-located with the designer to develop detailed project execution plans including a labor plan and camp accommodations. Ganotec West, a Kiewit affiliate, performed pipe spooling, fabrication and assembly of 10 piperack modules and 2 electrical modules that were sent to site.
Kiewit constructed the expansion of Hess’s gas processing facility in Tioga, North Dakota. Kiewit's scope included installing process pipe, structural steel erection and setting mechanical equipment.
Imperial Oil's Kearl Oil Sands project is located 70 kilometers north of Fort McMurray, Alberta, in the Athabasca oil sands region. Kiewit provided all the labor, construction equipment and bulk materials to build the Froth Treatment Facility and Flare Silo for this major oil sands project.
TIC, a subsidiary of Kiewit, constructed 18 pump stations and associated work for the Keystone Pipeline program. Keystone’s original pipeline system included a total of 39 pump stations delivering up to 590,000 bpd of oil from Canada’s Alberta oil fields and the Bakken formation to refineries across the U.S. Midwest.
Kiewit fabricated the topsides and mooring piles for this semi-submersible platform.
Construction started in March of 2011 and the construction phase of the project ended in April of 2013. The modules, flare boom, and pipe bridges totaled more than 17,500 tons.
Kiewit and joint venture partner IHI were awarded an EPC contract for the Cove Point LNG Export Project, which involves construction of liquefaction facilities for exporting LNG at the existing Cove Point LNG Terminal on the Chesapeake Bay in Lusby, MD. Together, the new and existing facilities will provide bi-directional import and export capabilities at Cove Point.
The team of Kiewit Australia and Ertech was awarded the general services contract for the Wheatstone LNG project located in Ashburton, Western Australia. Kiewit’s scope includes installation and maintenance of underground and aboveground utilities, construction and maintenance of roads and laydown areas, site support, and procurement of materials.
Ganotec West, a Kiewit affiliate, fabricated modules and completed all scopes of work for construction of the sole-sourced hydrogen manufacturing unit (HMU) for the Athabasca Oil Sands Project Scotford Upgrader Expansion.
Kiewit subsidiary, Ganotec, completed mechanical and piping work for Petro-Canada during the shutdown of the fluid catalytic cracking unit (FCCU) and the vapor recovery unit (VRU) at the Montréal Refinery.