Home | Sitemap | Contact Us
Language: English | Français
The Kiewit team was awarded the contract to engineer, procure, construct and startup the 554-megawatt combined cycle power plant with two GE 7FA combustion turbines, a GE D11 steam turbine with downflow exhaust, a Nooter/Eriksen heat recovery steam generator and a seven cell cooling tower.
The Kiewit team was awarded the contract to engineer, procure and construct the 400-megawatt simple cycle power plant with four GE LMS100 natural gas-fired combustion turbines.
Kiewit Pacific Co. is constructing a $146 million project for the Los Angeles Department of Water and Power. Pine Tree Wind Farm will be the largest city-owned and operated wind farm in the U.S., and the wind farm will produce enough energy to power 56,000 homes.
The $42 million Progress Energy project included procuring and installing four miles of a 16-duct utility in the corridor from the Bartow power plant to its northeast substation.
This 50-MW hydroelectric plant produces a non-consumptive, non-polluting and renewable form of energy for some 7,000 households. Built under an engineer-procure-construct contract, Peter Kiewit Sons Co. completed the project with minimal impacts to the surrounding landscape.
The Kiewit team was awarded the contract to construct and install the spray dryer absorber to the 400-megawatt coal-fired power plant. As part of the plant expansion, the client also upgraded emission controls on Units 1 and 2. The result will be the combined emissions from all four units will be less than the original two units.
Page 5 of 7
Stay connected with Kiewit:
Stay connected with Kiewit: